Site · Proposed
Quest Park Data Campus
Ampthill Road, Stewartby, Bedfordshire, England
Proposed four-building development on former clay workings. The June 2026 Section 35 direction requires a Development Consent Order. The developer states a signed grid connection for October 2034.
- Operator or sponsor
- Quest Pit Limited / Questpit Limited
- Published scale
- Up to 720 MW IT load; up to 1 GW total campus demand in application material
- Project evidence checked
The 2034 date is for a grid connection. Earlier permission for film studios is separate. No opening date or data-centre consent verified.
AI evidence
Mixed / broader infrastructure · AI predominance unverified
Grid/private-wire proposals support supply strategy, not installed AI compute.
The 2034 date is for a grid connection. Earlier permission for film studios is separate. No opening date or data-centre consent verified.
Planning evidence
Central Bedfordshire Council · Section 35 direction verified
The June 2026 direction places the data-centre proposal in the national route. Central Bedfordshire is the host authority, despite the Bedford address. A direction is not a Development Consent Order.
Government: Questpit Section 35 direction