Development phase · Under construction
Pure DC LON01 B2
Brent Cross, London, England
Pure DC reports final-transformer installation for the LON01 campus and describes B2 cooling works.
- Operator or sponsor
- Pure Data Centres
- Published scale
- 90 MW campus scale; building AI share undisclosed
- Project evidence checked
Electrical infrastructure milestones do not establish live tenant AI compute.
AI evidence
Mixed / broader infrastructure · AI predominance unverified
Closed-loop liquid cooling design disclosed. Installed tenant AI processors unverified.
Electrical infrastructure milestones do not establish live tenant AI compute.