Site · Under construction
Kao Data KLON-03
Harlow, Essex, England
Liquid-cooled AI and advanced-computing building at Harlow campus; construction announced March 2025.
- Operator or sponsor
- Kao Data
- Published scale
- 17.6MW IT load
- Project evidence checked
Operator currently lists KLON-03 under development. Existing KLON-01 and KLON-02 are each listed at 8.8MW operational capacity.
AI evidence
Documented AI design · live service unverified
Hybrid/direct-to-chip cooling and rack densities up to130kW are documented.
Documented AI design, not verified commissioning; separate from operational KLON-01/02.
Planning evidence
Harlow Council · Campus authority identified
Harlow Council identifies Kao Park as an Enterprise Zone site. The KLON-03-specific decision and conditions have not been separately audited.
Council: Kao Park and Enterprise Zone