Site · Under construction

Kao Data KLON-03

Harlow, Essex, England

Liquid-cooled AI and advanced-computing building at Harlow campus; construction announced March 2025.

Operator or sponsor
Kao Data
Published scale
17.6MW IT load
Project evidence checked

Operator currently lists KLON-03 under development. Existing KLON-01 and KLON-02 are each listed at 8.8MW operational capacity.

AI evidence

Documented AI design · live service unverified

Hybrid/direct-to-chip cooling and rack densities up to130kW are documented.

Documented AI design, not verified commissioning; separate from operational KLON-01/02.

Planning evidence

Harlow Council · Campus authority identified

Harlow Council identifies Kao Park as an Enterprise Zone site. The KLON-03-specific decision and conditions have not been separately audited.

Council: Kao Park and Enterprise Zone