Installation · Operational
Era4 / Fireworks AI Derbyshire
Chesterfield area, Derbyshire, England
Era4 describes the Derbyshire site as launched with Fireworks AI B300 infrastructure.
- Operator or sponsor
- Era4 / Fireworks AI
- Published scale
- 5 MW of direct liquid-cooled capacity
- Project evidence checked
Operator-stated capacity. The planned Era4 project in Newport is a separate development.
AI evidence
Evidenced AI operation
HGX B300 and HPE modular direct liquid cooling.
Operator-stated capacity. The planned Era4 project in Newport is a separate development.