← Infrastructure map

Installation · Operational

Era4 / Fireworks AI Derbyshire

Chesterfield area, Derbyshire, England

Era4 describes the Derbyshire site as launched with Fireworks AI B300 infrastructure.

Operator or sponsor
Era4 / Fireworks AI
Published scale
5 MW of direct liquid-cooled capacity
Project evidence checked

Operator-stated capacity. The planned Era4 project in Newport is a separate development.

AI evidence

Evidenced AI operation

HGX B300 and HPE modular direct liquid cooling.

Operator-stated capacity. The planned Era4 project in Newport is a separate development.

Sources